On a public-sector security project, the system being physically installed and the system being formally accepted are two different milestones — and the gap between them, commissioning, is where a project either closes cleanly or drags on for weeks longer than expected.

Commissioning verifies performance, not just presence

Installation confirms the equipment is in place. Commissioning confirms it actually performs as specified — camera coverage matches the design, access credentials work as intended, alerts reach the right people, and integrations with other systems function under real conditions, not just in a test environment.

Documentation handoff is part of commissioning, not a separate step

A commissioning process that ends with working equipment but no as-built documentation, no credential list, and no maintenance schedule isn't complete from an agency's standpoint — even if every camera is recording correctly. Expect documentation delivery to be a formal part of sign-off, not an afterthought.

Staff training is where a lot of projects quietly fall short

A system commissioned technically but never properly handed off operationally often underperforms in practice — not because the equipment failed, but because the staff using it day to day were never trained on it. A real commissioning process includes hands-on training, not just a manual.

Formal acceptance should have a clear, documented trigger

Project managers should expect — and ask for — a specific, written acceptance process: a punch list, a resolution period, and a formal sign-off point. Without that structure, "done" becomes a matter of opinion instead of a documented milestone.